HISTORY OF THE COMPANY

RN-GRP LLC is a service company that provides services in hydraulic fracturing, cementing, acidic and nitrogen treatment, as well as work involving various technological solutions using coiled tubing for the oil and gas industry.

On August 20, 2015 PJSC NK Rosneft Group purchased 100% of shares of Trikan Well Service LLC (on September 16, 2015, the Company was renamed to RN-GRP LLC, hereinafter referred to as the Company).

The company was founded in 2000 and became one of the largest Russian oilfield service companies. The Company's production activities are concentrated in Western and Eastern Siberia.

The company consists of two representative offices and three branches:

    1. Representative office in Moscow.
    2. Representative office in Irkutsk.
    3. Branch in Nizhnevartovsk:
      • Nizhnevartovsk production site;
      • Raduzhninsky production site;
      • Verkhnechonsky production site.
    4. Branch in Nefteyugansk:
      • Production site at the Priobskoye field;
      • Production site in Pyt-Yakh.
    5. Branch in Nyagan:
      • Nyagan production site.

The equipment fleet of RN-GRP LLC as of 01.06.2018 consisted of:

  1. Hydraulic fracturing fleet: 16 units.
  2. Coiled tubing fleet: 6 units.
  3. Cementing fleet: 7 units.

The key point of the RN-GRP LLC strategy is the provision of high-quality technological solutions aimed at increasing the economic and production efficiency of the Subsidiaries of PJSC NK Rosneft.

Scientific and Technical Center of RN-GRP LLC operates on the basis of the Russian State University of Oil and Gas named after Gubkin (Moscow), and its activities are mainly focused on optimizing well productivity by providing innovative solutions, conducting various studies, developing and optimizing new hydraulic fracturing fluid systems. The laboratory is equipped with the  up-to-date equipment, which can be used to carry out various studies and optimize parameters such as residual proppant conductivity, interfacial tension and rheology of fluids, wellbore cementing quality and to achieve sustainable use of water resources.

2017
year
2017
year
  • A large-scale process for updating and replacing the equipment of the existing hydraulic fracturing/coiled tubing/cementing fleets was launched;
  • Together with the Corporate Institute RN-UfaNIPIneft, the Company took an active part in the development and creation of a domestic software simulator for the RN-GRID hydraulic fracturing process, as part of the import substitution policy;
2016
year
2015
year
2015
year
  • ​In August, the PJSC NK Rosneft Group acquired 100% of shares of Traikan Well Service LLC.
  • Trikan Well Service LLC was renamed to  RN-GRP LLC.
2013-2014
year
2013-2014
year
  • Trikan Well Service performed hydraulic fracturing involving the injection of 550 tons into the Achimov reservoir.
2012
year
2012
year
  • The Trikan research center is established on the basis of the Russian State University of Oil and Gas named after Gubkin.
2011
year
2011
year
  • A long-term contract for hydraulic fracturing in the Volga-Ural area was concluded.
  • Production site is opened in the settlement of Kueda.
2010
year
2010
year
  • First jobs performed in Eastern Siberia.
  • Newco Well Service LLC was renamed to Trikan Well Service LLC.
  • Operation base is opened in New Urengoy.
2009
year
2009
year
  • Start of the project to carry out fracturing operations in coal-methane beds in Novokuznetsk, Kemerovo Region.
2008
year
2008
year
  • Operation base in Gubkinsky is opened.
2007
year
2007
year
  • June 4, 2007, at the Priobskoye field,  hydraulic fracturing was carried out involving injection of 860 tons of proppant. In terms of the volume of the proppant placed, this job has no analogues in Russia.
  • Newco Well Service LLC performed the first acidic frac.
2006
year
2006
year
  • The company performed hydraulic fracturing by injecting 536 tons of proppant, and first nitrogen hydraulic fracturing was performed as well.
2005
year
2005
year
  • Newco   Well Service LLC continues to increase production capacity in Russia. 
  • Operation base in Nyagan is opened.
2004
year
2004
year
  • Two hydraulic fracturing fleets and a second double cement truck become part of the company's assets.
2003
year
2003
year
  • The second hydraulic fracturing fleet was commissioned.
2001
year
2001
year
  • The first hydraulic fracturing job was performed.
  • The first long-term contract for hydraulic fracturing was signed.
2000
year
2000
year
  • On April 19, 2000, Newco Well Service Limited Liability Company was established and registered.   The first cementing and R&D work was performed for JV Vanyoganneft - the first customer of Newco   Well Service LLC.
  •  The first operation base of Newco   Well Service LLC was opened in Nizhnevartovsk.